Pedestrian Bridges For Centre Parcs Longford Forest Ireland
John Sisk & Son (Holdings) Ltd required three new bridges to interoperate into the grounds in the new Centre Parcs. The bridges were 2 x flat timber bridges fully assembled 3.6m x 1.8m, 1x timber bridge with raised centre 2.6m x1.5m. The design live load was 5kn/m2 and the balustrade load was 1.4/m2.
We worked with the customer to develop their initial concept to final design and then onto manufacture the finished product.
The bridges were made from pressure treated softwood with anti-slip board with excellent anti-slip qualities to meet the needs of high traffic levels in all weathers year round.
These were all sent to site fully assembled to allow for the fastest possible installation for a project on a tight deadline with customers already booked for holidays.